Kourosh Shahriar
- Numerical modeling of optimum spacing of TBM disk cutters, using a finite element method simulation. In: Geomechanics and Tunnelling. :
- Discussion of cutterhead opening design for earth pressure balance machines (EPBMs) in soft grounds. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. :
- Optimized Fuzzy Cmeans – Fuzzy Covariance – Fuzzy Maximum Likelihood Estimation Clustering Method Based on Deferential Evolutionary Optimization Algorithm for Identification of Rock Mass Discontinuities Sets. In: Periodica Polytechnica Civil Engineering. :
- Shape Effect of Fractures on Intensity and Density of Discreet Fracture Networks. In: Periodica Polytechnica Civil Engineering. :
- Statistical assessment of rock burst potential and contributions of considered predictor variables in the task. In: Tunnelling and Underground Space Technology, v. 72 (Februar 2018). (2018):
- Evaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansion. In: Tunnelling and Underground Space Technology, v. 61 (Januar 2017). (2017):
- Uncertainty analysis of groundwater inflow into underground excavations by stochastic discontinuum method: Case study of Siah Bisheh pumped storage project, Iran. In: Tunnelling and Underground Space Technology, v. 51 (Januar 2016). (2016):
- Evaluation of rock mass engineering geological properties using statistical analysis and selecting proper tunnel design approach in Qazvin–Rasht railway tunnel. In: Tunnelling and Underground Space Technology, v. 41 (März 2014). (2014):
- Interaction of twin tunnels and shallow foundation at Zand underpass, Shiraz metro, Iran. In: Tunnelling and Underground Space Technology, v. 26, n. 2 (März 2011). (2011):
- Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system. In: Tunnelling and Underground Space Technology, v. 25, n. 4 (Juli 2010). (2010):
- Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions. In: Tunnelling and Underground Space Technology, v. 23, n. 3 (Mai 2008). (2008):
- Developing intelligent classification models for rock burst prediction after recognizing significant predictor variables, Section 2: Designing classifiers. In: Tunnelling and Underground Space Technology, v. 84 (Februar 2019). (2019):
- Developing intelligent classification models for rock burst prediction after recognizing significant predictor variables, Section 1: Literature review and data preprocessing procedure. In: Tunnelling and Underground Space Technology, v. 83 (Januar 2019). (2019):