0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Krushna Chandra Sethi

Die folgende Bibliografie enthält alle in dieser Datenbank indizierten Veröffentlichungen, die mit diesem Namen als Autor, Herausgeber oder anderweitig Beitragenden verbunden sind.

  1. Behera, Amir Prasad / Chauhan, Mayank / Shrivastava, Gaurav / Singh, Prachi / Shukla, Jyoti / Sethi, Krushna Chandra: Optimizing trade-off between time, cost, and carbon emissions in construction using NSGA-III: an integrated approach for sustainable development. In: Asian Journal of Civil Engineering.

    https://doi.org/10.1007/s42107-024-01176-9

  2. Gahlot, Sumit / Mangal, Rajat / Arya, Abhishek / Sethy, Barada Prasad / Sethi, Krushna Chandra: Prediction of swelling pressure of expansive soil using machine learning methods. In: Asian Journal of Civil Engineering.

    https://doi.org/10.1007/s42107-024-01205-7

  3. Arya, Abhishek / Gunarani, G. I. / Rathinakumar, V. / Sharma, Apurva / Pati, Aditya Kumar / Sethi, Krushna Chandra (2024): NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects. In: Asian Journal of Civil Engineering, v. 25, n. 7 (Juli 2024).

    https://doi.org/10.1007/s42107-024-01133-6

  4. Sethi, Krushna Chandra / Prajapati, Umashankar / Parihar, Ashwin / Gupta, Chayan / Shrivastava, Gaurav / Sharma, Kamal (2024): Development of optimization model for balancing time, cost, and environmental impact in retrofitting projects with NSGA-III. In: Asian Journal of Civil Engineering, v. 25, n. 7 (Juli 2024).

    https://doi.org/10.1007/s42107-024-01102-z

  5. Sethi, Krushna Chandra / Rathinakumar, V. / Harishankar, S. / Bhadoriya, Gautam / Pati, Aditya Kumar (2024): Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects. In: Asian Journal of Civil Engineering, v. 25, n. 6 (24 Juni 2024).

    https://doi.org/10.1007/s42107-024-01069-x

  6. Agarwal, Aditya Kumar / Chauhan, Shyamveer Singh / Sharma, Kamal / Sethi, Krushna Chandra (2024): Development of time–cost trade-off optimization model for construction projects with MOPSO technique. In: Asian Journal of Civil Engineering, v. 25, n. 6 (24 Juni 2024).

    https://doi.org/10.1007/s42107-024-01063-3

Eine Veröffentlichung suchen...

Nur verfügbar mit
Mein Structurae

Volltext
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine