- Sustainable urban digital innovation: A socio-technical competency-based approach to evaluation. In: Sustainable Cities and Society. :
- Prescriptive maintenance of prestressed concrete bridges considering digital twin and key performance indicator. In: Engineering Structures, v. 302 (März 2024). (2024):
- Pile defect assessment using distributed temperature sensing: fundamental questions examined. In: Structural Health Monitoring, v. 23, n. 3 (September 2023). (2023):
- Integrity monitoring of cast in-situ piles using thermal approach: A field case study. In: Engineering Structures, v. 272 (Dezember 2022). (2022):
- Design and implementation of a smart infrastructure digital twin. In: Automation in Construction, v. 136 (April 2022). (2022):
- (2021): A business case for risk-informed bridge monitoring using the value of information. Vorgetragen bei: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021.
- (2021): Risk-informed asset management to tackle scouring on bridges across transport networks. In: Structure and Infrastructure Engineering, v. 18, n. 9 (März 2021).
- Flourishing Systems Re-envisioning Infrastructure as a Platform for Human Flourishing. In: Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, v. 173, n. 1 (März 2020). (2020):
- (2020): Thermal integrity testing of cast in situ piles: An alternative interpretation approach. In: Structural Health Monitoring, v. 20, n. 5 (Dezember 2020).
- Informing the Information Requirements of a Digital Twin: A Rail Industry Case Study. In: Proceedings of the Institution of Civil Engineers - Smart Infrastructure and Construction, v. 174, n. 2 (Juni 2021). (2021):
- Towards the future-proofing of UK infrastructure. In: Infrastructure Asset Management, v. 3, n. 1 (März 2016). (2016):
- Developing a Digital Twin at Building and City Levels: Case Study of West Cambridge Campus. In: Journal of Management in Engineering (ASCE), v. 36, n. 3 (Mai 2020). (2020):
- A Building Information Modelling approach to the alignment of organisational objectives to Asset Information Requirements. In: Automation in Construction, v. 104 (August 2019). (2019):