Kamel Saidi
- Graphical Control Interface for Construction and Maintenance Equipment. In: Journal of Construction Engineering and Management, v. 126, n. 3 (Mai 2000). (2000):
- Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot. In: Automation in Construction, v. 16, n. 1 (Januar 2007). (2007):