Lidia Ruiz-Ripoll
- (2012): Construction of Cable-Stayed Bridges Built on Temporary Supports. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2013): Structural Verification throughout the Tensioning Process of Cable-Stayed Bridges. Vorgetragen bei: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2014): Simulation of the construction process of cable-stayed bridges from a direct approach. Vorgetragen bei: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- The Modifications of the stress-state of cable-stayed bridges due to staggered construction of their superstructure. In: The Baltic Journal of Road and Bridge Engineering, v. 9, n. 4 (Februar 2014). (2014):
- Calculation of the Objective Service State in Cable-Stayed Bridges. Vorgetragen bei: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):