T. O. L. Roberts
- Groundwater control for construction in the Lambeth Group. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 155, n. 4 (Oktober 2002). (2002):
- Design and construction of a deep shaft for Crossrail. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 157, n. 4 (Oktober 2004). (2004):
- Construction of a deep shaft for Crossrail. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 161, n. 6 (Dezember 2008). (2008):
- Controlling clay pore pressures for cut-and-cover tunnelling. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 160, n. 4 (Oktober 2007). (2007):