D. W. E. Purba
- Empirical Approach For Preliminary Support and Excavation Method Design Based On Engineering Geological Study Of Mbay Dam Diversion Tunnel. In: IOP Conference Series: Earth and Environmental Science, v. 1233, n. 1 (1 August 2023). (2023):