- Digital Twins for Improving the Construction Safety: Literature Content Analysis and Gap Spotting for Future Directions. KN Toosi University of Technology, Tehran, Tehran IRAN. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 48, n. 4 (Juni 2024). (2024):
- Labor waste in housing construction projects: an empirical study. In: Smart and Sustainable Built Environment, v. 12, n. 2 (Januar 2022). (2022):
- An analysis of the literature on construction employee turnover: drivers, consequences, and future direction. In: Construction Management and Economics, v. 42, n. 9 (April 2024). (2024):
- Organizational Infrastructure and Information and Communication Technology Infrastructure Alignment in Construction Organizations. In: Journal of Construction Engineering and Management, v. 150, n. 7 (Juli 2024). (2024):
- “Parametric and generative mechanisms for infrastructure projects”. In: Automation in Construction, v. 154 (Oktober 2023). (2023):
- Information and Communication Technology Applications in Construction Organizations: a Scientometric Review. In: Journal of Information Technology in Construction, v. 28 (Februar 2023). (2023):
- Tolerance management domain model for semantic enrichment of BIMs. In: Automation in Construction, v. 141 (September 2022). (2022):
- (2022): Unintended Consequences of Productivity Improvement Strategies on Safety Behaviour of Construction Labourers; A Step toward the Integration of Safety and Productivity. In: Buildings, v. 12, n. 3 (8 März 2022).
- (2022): Information and Communication Technology (ICT) Utilization and Infrastructure Alignment in Construction Organizations. In: Buildings, v. 12, n. 3 (8 März 2022).
- (2021): Blockchain and Information Integration: Applications in New Zealand’s Prefabrication Supply Chain. In: Buildings, v. 11, n. 12 (23 November 2021).
- Blockchain and the ‘Internet of Things' for the construction industry: research trends and opportunities. In: Automation in Construction, v. 132 (Dezember 2021). (2021):
- Causes of Defects Associated with Tolerances in Construction: A Case Study. In: Journal of Management in Engineering (ASCE), v. 37, n. 4 (Juli 2021). (2021):
- A Fixed Start Scheduling Approach for Repetitive Construction Projects. In: KSCE Journal of Civil Engineering, v. 24, n. 6 (April 2020). (2020):
- Preparation of small to medium-sized enterprises to earthquake disaster. In: Bulletin of the New Zealand Society for Earthquake Engineering, v. 51, n. 4 (Dezember 2018). (2018):
- A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules. In: Automation in Construction, v. 92 (August 2018). (2018):