D. A. Ponniah
- Computational framework for discontinuous modelling of masonry arch bridges. In: Computers & Structures, v. 79, n. 19 (Juli 2001). (2001):
- A method of increasing arch bridge capacity economically. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 116, n. 1 (Februar 1996). (1996):
- Load-carrying capacity of masonry arch bridges estimated from multi-span model test. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 128, n. 1 (Februar 1998). (1998):
- Fill stresses in a new brick arch bridge subject to heavy axle-load tests. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 122, n. 2 (Januar 1997). (1997):
- Effect of temperature on lime-soil stabilization. In: Construction and Building Materials, v. 6, n. 4 (Januar 1992). (1992):
- Model Tests To Determine The Effect Of Fill On Buried Arches.. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 104, n. 4 (November 1994). (1994):
- Long term monitoring of fill pressures in a new brickwork arch bridge. In: Construction and Building Materials, v. 13, n. 3 (April 1999). (1999):