E. Plebankiewicz
- Creating a Construction Schedule Specyfing Fuzzy Norms and the Number of Workers. In: Archives of Civil Engineering, v. 62, n. 3 (September 2016). (2016):
- Life Cycle Cost Modelling of Buildings with Consideration of the Risk. In: Archives of Civil Engineering, v. 62, n. 2 (Juni 2016). (2016):
- Estimation Of Task Completion Times With The Use Of The PERT Method On The Example Of A Real Construction Project. In: Archives of Civil Engineering, v. 61, n. 3 (September 2015). (2015):
- Design and Build Procurement System – Contractor Selection. In: Archives of Civil Engineering, v. 58, n. 4 (Dezember 2012). (2012):
- Simple Prequalification Models. In: Archives of Civil Engineering, v. 56, n. 4 (Dezember 2010). (2010):
- Original Model for Estimating the Whole Life Costs of Buildings and its Verification. In: Archives of Civil Engineering, v. 65, n. 2 (Juni 2019). (2019):