Alan Platt
- (2012): West Gate Bridge – Conquering the Logistical Challenges. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- (2012): West Gate Bridge Strengthening Project - Strengthening of the Main Cable Stayed Bridge. Vorgetragen bei: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012.
- Queensferry Crossing – Cable Stayed Bridge Deck and Cables – Design and Construction. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 172, n. 2 (Juni 2019). (2019):