Jaime Planas
- Blind competition on the numerical simulation of slabs reinforced with conventional flexural reinforcement and fibers subjected to punching loading configuration. In: Structural Concrete. :
- Blind competition on the numerical simulation of continuous shallow steel‐fiber reinforced concrete beams failing in bending. In: Structural Concrete, v. 24, n. 3 (April 2023). (2023):
- Competición a ciegas de simulaciones numéricas de vigas de hormigón reforzado con fibras que fallan a cortante. In: Hormigón y acero, v. 73, n. 296 (10 März 2022). (2022):
- Study of the influence of the oxide and concrete parameters on the results of accelerated corrosion tests. In: Procedia Structural Integrity, v. 2 ( 2016). (2016):
- Transition from smeared to localized cracking in macro-defect-free quasibrittle structures. In: Procedia Structural Integrity, v. 2 ( 2016). (2016):
- Blind competition on the numerical simulation of steel‐fiber‐reinforced concrete beams failing in shear. In: Structural Concrete, v. 22, n. 2 (April 2021). (2021):
- Study of the loss of bond in reinforced concrete specimens with accelerated corrosion by means of push-out tests. In: Construction and Building Materials, v. 160 (Januar 2018). (2018):
- Depósitos criogénicos de hormigón pretensado. In: Hormigón y acero, v. 39, n. 169 (4. Quartal 1988). (1988):
- (1985): Fractura del hormigón en régimen no lineal. Intentos para medir la energía de fractura GF. In: Informes de la Construcción, v. 37, n. 372 (Juli 1985).
- Comportamiento del hormigón pretensado, a muy bajas temperaturas. In: Hormigón y acero, v. 33, n. 143 (2. Quartal 1982). (1982):
- Propiedades mecánicas a temperaturas criogénicas del acero de pretensado. In: Hormigón y acero, v. 29, n. 126 (1. Quartal 1978). (1978):