-
Piyumra, R. A. D. / Disaratna, V. / Perera, B. A. K. S. (2025): Framework for Integrating Experiential Knowledge, Personal Constructs, and Knowledge Transfer toward Successful Construction Claims Management. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 17, n. 1 (Februar 2025).
https://doi.org/10.1061/jladah.ladr-1154
-
Chamikara, K. L. / Perera, B. A. K. S. / Raigama Acharige, Dinithi Piyumra / Ekanayake, Biyanka: Adaptability of BIM technology to mitigate the cost overruns in design and build projects. In: Construction Innovation.
https://doi.org/10.1108/ci-01-2024-0018
-
Weerawardana, I. A. D. S. S. / Perera, B. A. K. S. / Senanayake, S. M. A. H. (2024): Management of Disputes Related to Contractor’s Liability: Differing Site Conditions in Design–Build Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 4 (November 2024).
https://doi.org/10.1061/jladah.ladr-1133
-
Kurukulasooriya, I. N. / Amaratunga, C. U. / Perera, B. A. K. S. / Seneviratne, L. D. I. P. (2024): Enhancing Collaboration in Construction Projects: A Delphi Study on the Convergence of Local and Foreign Contractors. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 4 (November 2024).
https://doi.org/10.1061/jladah.ladr-1155
-
Rasanjali, W. A. / Mendis, A. P. K. D. / Perera, B. A. K. S. / Disaratna, Vijitha: Implementing enterprise resource planning for lean waste minimisation: challenges and proposed strategies. In: Smart and Sustainable Built Environment.
https://doi.org/10.1108/sasbe-04-2022-0068
-
Atapattu, A. M. D. S. / Hadiwattage, Chandanie / Perera, B. A. K. S. / Rajaratnam, Dilakshan: Employing criteria scoring matrix in appraising the economic return of transcending to a circular built environment. In: Smart and Sustainable Built Environment.
https://doi.org/10.1108/sasbe-04-2023-0077
-
Karunarathna, Deraniyagalage Chanaka / Perera, H. A. H. P. / Perera, B. A. K. S. / Disaratna, P. A. P. V. D. S.: Influence of delay in utility shifting for extension of time claims in road construction projects in Sri Lanka. In: Smart and Sustainable Built Environment.
https://doi.org/10.1108/sasbe-07-2023-0179
-
Ruwanpura, U. D. R. E. / Perera, B. A. K. S. (2022): Management of external stakeholders' influences in donor-funded irrigation infrastructure projects in Sri Lanka. In: Smart and Sustainable Built Environment, v. 12, n. 4 (August 2022).
https://doi.org/10.1108/sasbe-12-2021-0235
-
Samarakkody, Aravindi / Perera, B. A. K. S. (2021): Application of Soft Landings concept in Sri Lanka to narrow the building performance gap, enablers and barriers. In: Smart and Sustainable Built Environment, v. 12, n. 1 (September 2021).
https://doi.org/10.1108/sasbe-03-2021-0052
-
Gunasekara, K. A. / Perera, B. A. K. S. / Kurukulasooriya, I. N.: Gender-specific occupational stress management in construction professionals: a comparative analysis of contractor quantity surveyors work at site. In: Construction Innovation.
https://doi.org/10.1108/ci-11-2022-0290
-
Ruwanpura, U. D. R. E. / Perera, B. A. K. S. / Ranadewa, Tharusha: Lean tools used in administrative processes across sectors: a systematic review and insights for the construction industry. In: Construction Innovation.
https://doi.org/10.1108/ci-03-2023-0057
-
Abhayantha, K. I. L. / Perera, B. A. K. S. / Perera, H. A. H. P. / Palliyaguru, Roshani S.: Management of environmental risks in highway construction projects in Sri Lanka. In: Construction Innovation.
https://doi.org/10.1108/ci-08-2022-0202
-
Jayanetti, J. K. D. D. T. / Perera, B. A. K. S. / Waidyasekara, K. G. A. S. / Siriwardena, Mohan (2023): Critical Analysis of Lean Construction Maturity Models: A Systematic Literature Review. In: Buildings, v. 13, n. 6 (23 Mai 2023).
https://doi.org/10.3390/buildings13061508
-
Jayamaha, B. H. V. H. / Perera, B. A. K. S. / Gimhani, K. D. M. / Rodrigo, M. N. N. (2023): Adaptability of enterprise resource planning (ERP) systems for cost management of building construction projects in Sri Lanka. In: Construction Innovation, v. 24, n. 5 (Juni 2023).
https://doi.org/10.1108/ci-05-2022-0108
-
Moragane, H. P. M. N. L. B. / Perera, B. A. K. S. / Palihakkara, Asha Dulanjalie / Ekanayake, Biyanka (2022): Application of computer vision for construction progress monitoring: a qualitative investigation. In: Construction Innovation, v. 24, n. 2 (Oktober 2022).
https://doi.org/10.1108/ci-05-2022-0130
-
Perera, Hashan Pubudu / Perera, B. A. K. S. / Palihakkara, Asha Dulanjalie (2022): Financial and economic risk management in coastal land reclamation projects. In: Construction Innovation, v. 23, n. 4 (September 2022).
https://doi.org/10.1108/ci-12-2021-0238
-
Gunasekara, D. M. H. / Indikatiya, I. H. P. R. / Perera, B. A. K. S. / Senaratne, Sepani (2021): Managing intragroup conflicts within project design teams during pre-contract stage that effect the project deliverables in Sri Lanka. In: Construction Innovation, v. 23, n. 2 (September 2021).
https://doi.org/10.1108/ci-05-2020-0078
-
Perera, B. A. K. S. / Ridmika, K. I. / Wijewickrama, M. K. C. S. (2021): Life management of the quantity surveyors working for contractors at sites: female vs male. In: Construction Innovation, v. 22, n. 4 (Oktober 2021).
https://doi.org/10.1108/ci-05-2020-0090
-
Abeynayake, Dilani Niroshika / Perera, B. A. K. S. / Hadiwattege, Chandanie (2021): Defining a ‘business model' in the construction context. In: Intelligent Buildings International, v. 14, n. 4 (Juni 2021).
https://doi.org/10.1080/17508975.2021.1927660
-
Nanayakkara, N. W. K. V. V. / Perera, B. A. K. S. / Illankoon, I. M. Chethana S. (2021): On-site renewable energy for industrial buildings in Sri Lanka: a life-cycle cost analysis. In: Intelligent Buildings International, v. 14, n. 4 (Juni 2021).
https://doi.org/10.1080/17508975.2021.1938505
-
Rajaratnam, D. / Weerasinghe, D. M. L. P. / Abeynayake, M. / Perera, B. A. K. S. / Ochoa, J. J. (2021): Potential use of Augmented Reality in pre-contract design communication in construction projects. In: Intelligent Buildings International, v. 14, n. 6 (April 2021).
https://doi.org/10.1080/17508975.2021.1911776
-
Gallage, S. D. / Devapriya, K. A. K. / Perera, B. A. K. S. (2021): A framework for the better integration of the crucial economic factors of Sri Lankan urban renewal projects. In: Intelligent Buildings International, v. 14, n. 4 (Juni 2021).
https://doi.org/10.1080/17508975.2021.1902256
-
Amarasekara, W. D. L. / Perera, B. A. K. S. / Rodrigo, M. N. N. (2018): Impact of Differing Site Conditions on Construction Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (August 2018).
https://doi.org/10.1061/(asce)la.1943-4170.0000257
-
Perera, W. Y. / Perera, B. A. K. S. / Jayasena, N. S. (2019): Adaptability of the shared workspace concept, for office buildings in Sri Lanka. In: Intelligent Buildings International, v. 13, n. 4 (April 2019).
https://doi.org/10.1080/17508975.2019.1588701
-
Alwis, G. C. D. / Perera, B. A. K. S. / Gallage, S. D. / Indikatiya, I. H. P. R. (2021): Enhancing the quality of bid evaluation in government refurbishment projects. In: Intelligent Buildings International, v. 14, n. 3 (Juli 2021).
https://doi.org/10.1080/17508975.2020.1753639
-
Dewagoda, Kaveesha Gihani / Perera, B. A. K. S. / Senaratne, Sepani (2021): A "knowledge value chain" framework for contractor organisations to maximise chances of winning tenders. In: Built Environment Project and Asset Management, v. 11, n. 4 (Juli 2021).
https://doi.org/10.1108/bepam-02-2020-0021
-
Wijeratne, W. M. P. U. / Perera, B. A. K. S. / De Silva, L. (2014): Identification and assessment risks in maintenance operations. In: Built Environment Project and Asset Management, v. 4, n. 4 (September 2014).
https://doi.org/10.1108/bepam-09-2013-0041
-
Ekanayake, E. M. K. / Perera, B. A. K. S. (2016): Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. In: Built Environment Project and Asset Management, v. 6, n. 5 (November 2016).
https://doi.org/10.1108/bepam-08-2015-0039
-
Hettige, Nayani / Perera, B. A. K. S. / Mallawaarachchi, Harshini (2017): A framework for adopting green leasing in developing countries: the case of Sri Lanka. In: Built Environment Project and Asset Management, v. 7, n. 4 (September 2017).
https://doi.org/10.1108/bepam-11-2016-0059
-
Gunatilake, Sachie / Perera, B. A. K. S. (2018): Built environment sustainability: what’s new and what’s next?. In: Built Environment Project and Asset Management, v. 8, n. 5 (November 2018).
https://doi.org/10.1108/bepam-11-2018-135