Ionut Paunescu
- Case study of adjacent integral bridges supported on continuous secant piled walls. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering. :
- Decommissioning of the A14 Huntingdon Railway Viaduct, Cambridgeshire. In: The Structural Engineer, v. 100, n. 1 (Januar 2022). (2022):