- NSGA-III based optimization model for balancing time, cost, and quality in resource-constrained retrofitting projects. In: Asian Journal of Civil Engineering, v. 25, n. 7 (Juli 2024). (2024):
- Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects. In: Asian Journal of Civil Engineering, v. 25, n. 6 (24 Juni 2024). (2024):