Wonjun Park
- Utilizing synthetic images to enhance the automated recognition of small-sized construction tools. In: Automation in Construction, v. 163 (Juli 2024). (2024):
- 전문건설공사의 발주사례분석을 통한 입찰업무의 개선방안 (Improvements of the Bidding Process through Order Case Analysis of Specialty Construction). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 5 (Oktober 2015). (2015):
- 1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구 (Study on Improvement of Cost Calculation Method in Construction less than One Day Workload). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 5 (Oktober 2014). (2014):
- Life cycle CO2 assessment method for concrete using CO2 balance and suggestion to decrease LCCO2 of concrete in South-Korean apartment. In: Energy and Buildings, v. 58 (März 2013). (2013):
- Influence of bonded mortar of recycled concrete aggregates on interfacial characteristics – Porosity assessment based on pore segmentation from backscattered electron image analysis. In: Construction and Building Materials, v. 212 (Juli 2019). (2019):
- Influence of metal impurity on recycled aggregate concrete and inspection method for aluminum impurity. In: Construction and Building Materials, v. 40 (März 2013). (2013):