-
Yoon, Sungboo / Park, Moonseo / Ahn, Changbum R. (2024): LaserDex: Improvising Spatial Tasks Using Deictic Gestures and Laser Pointing for Human–Robot Collaboration in Construction. In: Journal of Computing in Civil Engineering, v. 38, n. 3 (Mai 2024).
https://doi.org/10.1061/jccee5.cpeng-5715
-
Cho, Jongwoo / Song, Kwonsik / Kwon, Nahyun / Park, Moonseo / Kim, Tae Wan (2024): Effects of Periodic Materials on Distance Attenuation in Wall–Slab Structures: An Experiment. In: Buildings, v. 14, n. 3 (21 Februar 2024).
https://doi.org/10.3390/buildings14030694
-
Yoon, Inseok / Ahn, Changbum / Ahn, Seungjun / Lee, Bogyeong / Lee, Jongjik / Park, Moonseo (2024): Enhancing indoor building occupant safety in the built environment: Assessing the validity of social force modeling for simulating physical distancing behaviors. In: Developments in the Built Environment, v. 17 (März 2024).
https://doi.org/10.1016/j.dibe.2024.100336
-
Ishdorj, Saruul / Ahn, Changbum R. / Park, Moonseo (2024): Major Factors Influencing Safety Knowledge–Sharing Behaviors of Construction Field Workers: Worker-to-Worker Level Safety Communication. In: Journal of Construction Engineering and Management, v. 150, n. 4 (April 2024).
https://doi.org/10.1061/jcemd4.coeng-14121
-
Yoon, Sungboo / Kim, YeSeul / Park, Moonseo / Ahn, Changbum R. (2023): Effects of Spatial Characteristics on the Human–Robot Communication Using Deictic Gesture in Construction. In: Journal of Construction Engineering and Management, v. 149, n. 7 (Juli 2023).
https://doi.org/10.1061/jcemd4.coeng-12997
-
Moon, Hyosoo / Park, Moonseo / Ahn, Yonghan / Kwon, Nahyun (2023): Moderating Effect of Project Type on the Relationship between Project Delivery Systems and Cost Performance. In: Journal of Management in Engineering (ASCE), v. 39, n. 1 (Januar 2023).
https://doi.org/10.1061/(asce)me.1943-5479.0001097
-
Lee, Jin Gang / Lee, Hyun-Soo / Park, Moonseo / Seo, JoonOh (2021): Early-stage cost estimation model for power generation project with limited historical data. In: Engineering, Construction and Architectural Management, v. 29, n. 7 (Juli 2021).
https://doi.org/10.1108/ecam-04-2020-0261
-
Hyun, Hosang / Yoon, Inseok / Lee, Hyun-Soo / Park, Moonseo / Lee, Jeonghoon (2021): Multiobjective optimization for modular unit production lines focusing on crew allocation and production performance. In: Automation in Construction, v. 125 (Mai 2021).
https://doi.org/10.1016/j.autcon.2021.103581
-
Shin, Hyunji / Lee, Hyun-Soo / Park, Moonseo / Lee, Jin Gang (2018): Facility Management Process of an Office Building. In: Journal of Infrastructure Systems, v. 24, n. 3 (September 2018).
https://doi.org/10.1061/(asce)is.1943-555x.0000436
-
Choi, Minji / Lee, SangHyun / Park, Moonseo / Lee, Hyun-Soo (2018): Effect of Dynamic Emergency Cues on Fire Evacuation Performance in Public Buildings. In: Journal of Infrastructure Systems, v. 24, n. 4 (Dezember 2018).
https://doi.org/10.1061/(asce)is.1943-555x.0000449
-
Anderson, Kyle / Song, Kwonsik / Lee, SangHyun / Lee, Hyunsoo / Park, Moonseo (2015): Energy consumption in households while unoccupied: Evidence from dormitories. In: Energy and Buildings, v. 87 (Januar 2015).
https://doi.org/10.1016/j.enbuild.2014.11.062
-
Lee, Seulbi / Park, Moonseo / Lee, Hyun-Soo / Ham, Youngjib (2020): Impact of Demand-Side Response on Community Resilience: Focusing on a Power Grid after Seismic Hazards. In: Journal of Management in Engineering (ASCE), v. 36, n. 6 (November 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000844
-
Cho, Jongwoo / Lee, Hyun-Soo / Park, Moonseo / Song, Kwonsik / Kim, Jaegon / Kwon, Nahyun (2020): Estimating the Performance of Heavy Impact Sound Insulation Using Empirical Approaches. In: Journal of Asian Architecture and Building Engineering, v. 20, n. 3 (Oktober 2020).
https://doi.org/10.1080/13467581.2020.1786390
-
Jang, Youjin / Kwon, Nahyun / Ahn, Yonghan / Lee, Hyun-Soo / Park, Moonseo (2019): International Diversification and Performance of Construction Companies: Moderating Effect of Regional, Product, and Industry Diversifications. In: Journal of Management in Engineering (ASCE), v. 35, n. 5 (September 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000713
-
Lee, Kwang-Pyo / Lee, Hyun-Soo / Park, Moonseo / Kim, Du Yon / Jung, Minhyuk (2017): Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (Juli 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000510
-
Park, Moonseo / Nepal, Madhav Prasad / Dulaimi, Mohammed Fadhil (2004): Dynamic Modeling for Construction Innovation. In: Journal of Management in Engineering (ASCE), v. 20, n. 4 (Oktober 2004).
https://doi.org/10.1061/(asce)0742-597x(2004)20:4(170)
-
Park, Moonseo / Chu, Yongsik / Lee, Hyun-Soo / Kim, Wooyoung (2009): Evaluation Methods for Construction Projects. In: Journal of Civil Engineering and Management, v. 15, n. 4 (Dezember 2009).
https://doi.org/10.3846/1392-3730.2009.15.349-359
-
Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Chi, Seokho (2018): Multimethod Supply Chain Simulation Model for High-Rise Building Construction Projects. In: Journal of Computing in Civil Engineering, v. 32, n. 3 (Mai 2018).
https://doi.org/10.1061/(asce)cp.1943-5487.0000751
-
Ji, Sae-Hyun / Park, Moonseo / Lee, Hyun-Soo / Ahn, Joseph / Kim, Namho / Son, Bosik (2011): Military Facility Cost Estimation System Using Case-Based Reasoning in Korea. In: Journal of Computing in Civil Engineering, v. 25, n. 3 (Mai 2011).
https://doi.org/10.1061/(asce)cp.1943-5487.0000082
-
Kim, Hyunsoo / Lee, Hyun-Soo / Park, Moonseo / Chung, BooYoung / Hwang, Sungjoo (2015): Information Retrieval Framework for Hazard Identification in Construction. In: Journal of Computing in Civil Engineering, v. 29, n. 3 (Mai 2015).
https://doi.org/10.1061/(asce)cp.1943-5487.0000340
-
Peña-Mora, Feniosky / Park, Moonseo (2001): Dynamic Planning for Fast-Tracking Building Construction Projects. In: Journal of Construction Engineering and Management, v. 127, n. 6 (Dezember 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:6(445)
-
Lee, Bogyeong / Lee, Hyun-Soo / Park, Moonseo / Kim, Hyunsoo (2015): Influence Factors of Learning-Curve Effect in High-Rise Building Constructions. In: Journal of Construction Engineering and Management, v. 141, n. 8 (August 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000997
-
Park, Moonseo / Yang, Youngjun / Lee, Hyun-Soo / Han, Sangwon / Ji, Sae-Hyun (2012): Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path. In: Journal of Construction Engineering and Management, v. 138, n. 7 (Juli 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000493
-
Park, Moonseo / Ha, Sungbong / Lee, Hyun-Soo / Choi, Yoon-ki / Kim, Hyunsoo / Han, Sangwon (2013): Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction. In: Automation in Construction, v. 32 (Juli 2013).
https://doi.org/10.1016/j.autcon.2013.01.010
-
Park, Moonseo (2005): Model-based dynamic resource management for construction projects. In: Automation in Construction, v. 14, n. 5 (Oktober 2005).
https://doi.org/10.1016/j.autcon.2004.11.001
-
Lee, Sang Hyun / Peña-Mora, Feniosky / Park, Moonseo (2006): Dynamic planning and control methodology for strategic and operational construction project management. In: Automation in Construction, v. 15, n. 1 (Januar 2006).
https://doi.org/10.1016/j.autcon.2005.02.008
-
Choi, Byungjoo / Lee, Hyun-Soo / Park, Moonseo / Cho, Yong K. / Kim, Hyunsoo (2014): Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects. In: Journal of Construction Engineering and Management, v. 140, n. 9 (September 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000885
-
Nepal, Madhav Prasad / Park, Moonseo / Son, Bosik (2006): Effects of Schedule Pressure on Construction Performance. In: Journal of Construction Engineering and Management, v. 132, n. 2 (Februar 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:2(182)
-
Dulaimi, Mohammed Fadhil / Nepal, Madhav Prasad / Park, Moonseo (2005): A hierarchical structural model of assessing innovation and project performance. In: Construction Management and Economics, v. 23, n. 6 (Juli 2005).
https://doi.org/10.1080/01446190500126684
-
Hwang, Sungjoo / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun (2016): Hybrid Simulation Framework for Immediate Facility Restoration Planning after a Catastrophic Disaster. In: Journal of Construction Engineering and Management, v. 142, n. 8 (August 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001146