0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Die folgende Bibliografie enthält alle in dieser Datenbank indizierten Veröffentlichungen, die mit diesem Namen als Autor, Herausgeber oder anderweitig Beitragenden verbunden sind.

  1. Won, Jongbin / Park, Jong-Woong / Shim, Changsu / Park, Man-Woo (2021): Bridge-surface panoramic-image generation for automated bridge-inspection using deepmatching. In: Structural Health Monitoring, v. 20, n. 4 (April 2021).

    https://doi.org/10.1177/1475921720930380

  2. Won, Daeyoun / Chi, Seokho / Park, Man-Woo (2020): UAV-RFID Integration for Construction Resource Localization. In: KSCE Journal of Civil Engineering, v. 24, n. 6 (April 2020).

    https://doi.org/10.1007/s12205-020-2074-y

  3. Chung, Kyung-Soo / Jeon, Bae-Ho / Park, Man-Woo / Do, Byung-Ho (2012): 밀착조임 볼트체결에 따른 판폭두께비가 큰 변단면 프레임의 구조성능에 관한 실험적 연구 (Experimental Study on Structural Behavior of Tapered non-compact Frame with Snug-tightened Conditions). In: Journal of Korean Society of Steel Construction (한국강구조학회 논문집), v. 24, n. 3 (Juni 2012).

    https://doi.org/10.7781/kjoss.2012.24.3.257

  4. Park, Man-Woo / Koch, Christian / Brilakis, Ioannis (2012): Three-Dimensional Tracking of Construction Resources Using an On-Site Camera System. In: Journal of Computing in Civil Engineering, v. 26, n. 4 (Juli 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000168

  5. Hui, Linda / Park, Man-Woo / Brilakis, Ioannis (2015): Automated Brick Counting for Façade Construction Progress Estimation. In: Journal of Computing in Civil Engineering, v. 29, n. 6 (November 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000423

  6. Park, Man-Woo / Elsafty, Nehad / Zhu, Zhenhua (2015): Hardhat-Wearing Detection for Enhancing On-Site Safety of Construction Workers. In: Journal of Construction Engineering and Management, v. 141, n. 9 (September 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000974

  7. Park, Man-Woo / Makhmalbaf, Atefe / Brilakis, Ioannis (2011): Comparative study of vision tracking methods for tracking of construction site resources. In: Automation in Construction, v. 20, n. 7 (November 2011).

    https://doi.org/10.1016/j.autcon.2011.03.007

  8. Park, Man-Woo / Brilakis, Ioannis (2016): Continuous localization of construction workers via integration of detection and tracking. In: Automation in Construction, v. 72 (Dezember 2016).

    https://doi.org/10.1016/j.autcon.2016.08.039

  9. Zhu, Zhenhua / Park, Man-Woo / Koch, Christian / Soltani, Mohamad / Hammad, Amin / Davari, Khashayar (2016): Predicting movements of onsite workers and mobile equipment for enhancing construction site safety. In: Automation in Construction, v. 68 (August 2016).

    https://doi.org/10.1016/j.autcon.2016.04.009

  10. Park, Man-Woo / Brilakis, Ioannis (2012): Construction worker detection in video frames for initializing vision trackers. In: Automation in Construction, v. 28 (Dezember 2012).

    https://doi.org/10.1016/j.autcon.2012.06.001

  11. Dai, Fei / Park, Man-Woo / Sandidge, Matthew / Brilakis, Ioannis (2015): A vision-based method for on-road truck height measurement in proactive prevention of collision with overpasses and tunnels. In: Automation in Construction, v. 50 (Februar 2015).

    https://doi.org/10.1016/j.autcon.2014.10.005

  12. Lee, Yong-Ju / Park, Man-Woo (2019): 3D tracking of multiple onsite workers based on stereo vision. In: Automation in Construction, v. 98 (Februar 2019).

    https://doi.org/10.1016/j.autcon.2018.11.017

Eine Veröffentlichung suchen...

Nur verfügbar mit
Mein Structurae

Volltext
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine