W. Pan
- A Virtual Reality Supported Approach to Occupancy Engagement in Building Energy Design for Closing the Energy Performance Gap. In: Procedia Engineering, v. 118 ( 2015). (2015):
- A BIM-integrated Fuzzy Multi-criteria Decision Making Model for Selecting Low-Carbon Building Measures. In: Procedia Engineering, v. 118 ( 2015). (2015):
- Cable-driven parallel robot for curtain wall module installation. In: Automation in Construction, v. 138 (Juni 2022). (2022):
- BIM-aided variable fuzzy multi-criteria decision making of low-carbon building measures selection. In: Sustainable Cities and Society, v. 27 (November 2016). (2016):
- Six-node triangle finite volume method for solids with a rotational degree of freedom for incompressible material. In: Computers & Structures, v. 88, n. 23-24 (Dezember 2010). (2010):
- Investigation of an iterative sub-structure method for elastic and elastic–plastic framework analysis. In: Computers & Structures, v. 84, n. 10-11 (April 2006). (2006):