Wallied Orabi
- Analysis of Time, Cost, and Environmental Impact Relationships at the Building-Material Level. In: Journal of Management in Engineering (ASCE), v. 32, n. 4 (Juli 2016). (2016):
- Optimizing Resource Utilization during the Recovery of Civil Infrastructure Systems. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (Oktober 2010). (2010):
- Innovative Linear Formulation for Transportation Reconstruction Planning. In: Journal of Computing in Civil Engineering, v. 30, n. 3 (Mai 2016). (2016):
- Efficient Optimization of Post-Disaster Reconstruction of Transportation Networks. In: Journal of Computing in Civil Engineering, v. 30, n. 3 (Mai 2016). (2016):
- Optimizing the Rehabilitation Efforts of Aging Transportation Networks. In: Journal of Construction Engineering and Management, v. 138, n. 4 (April 2012). (2012):
- Optimizing Postdisaster Reconstruction Planning for Damaged Transportation Networks. In: Journal of Construction Engineering and Management, v. 135, n. 10 (Oktober 2009). (2009):