-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1994): Evaluating performance potential in the selection of construction contractors. In: Engineering, Construction and Architectural Management, v. 1, n. 1 (Januar 1994).
https://doi.org/10.1108/eb020991
-
Kometa, Simon T. / Olomolaiye, Paul O. / Harris, Frank C. (1995): An evaluation of clients' needs and responsibilities in the construction process. In: Engineering, Construction and Architectural Management, v. 2, n. 1 (Januar 1995).
https://doi.org/10.1108/eb021003
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1996): Tendering procedures, contractual arrangements and Latham: the contractors' view. In: Engineering, Construction and Architectural Management, v. 3, n. 1 (Januar 1996).
https://doi.org/10.1108/eb021025
-
Proverbs, David G. / Olomolaiye, Paul O. / Harris, Frank C. (1996): Planned construction times and labour utilization — a comparison of UK and French contractors. In: Engineering, Construction and Architectural Management, v. 3, n. 3 (März 1996).
https://doi.org/10.1108/eb021032
-
Akadiri, Peter O. / Olomolaiye, Paul O. (2012): Development of sustainable assessment criteria for building materials selection. In: Engineering, Construction and Architectural Management, v. 19, n. 6 (November 2012).
https://doi.org/10.1108/09699981211277568
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1998): What motivates construction craftsmen in developing countries? A case study of Indonesia. In: Building and Environment, v. 33, n. 2-3 (März 1998).
https://doi.org/10.1016/s0360-1323(97)00041-3
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1995): A review of contractor selection practice in the U.K. construction industry. In: Building and Environment, v. 30, n. 4 (Oktober 1995).
https://doi.org/10.1016/0360-1323(95)00008-t
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1994): Evaluating prequalification criteria in contractor selection. In: Building and Environment, v. 29, n. 4 (Oktober 1994).
https://doi.org/10.1016/0360-1323(94)90003-5
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1994): Factors influencing U.K. construction clients' choice of contractor. In: Building and Environment, v. 29, n. 2 (Januar 1994).
https://doi.org/10.1016/0360-1323(94)90074-4
-
Chinyio, Ezekiel A. / Olomolaiye, Paul O. / Corbett, Pauline (1998): Quantification of Construction Clients' Needs through Paired Comparisons. In: Journal of Management in Engineering (ASCE), v. 14, n. 1 (Januar 1998).
https://doi.org/10.1061/(asce)0742-597x(1998)14:1(87)
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1997): Regional Comparison of Indonesian Construction Productivity. In: Journal of Management in Engineering (ASCE), v. 13, n. 2 (März 1997).
https://doi.org/10.1061/(asce)0742-597x(1997)13:2(33)
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Kometa, Simon T. / Harris, Frank C. (1996): Project managers’ perception of production problems — An Indonesian case study. Lack of material was considered of most importance to productivity problems whilst re‐work was equally a problem under kendall concordance analysis. In: Building Research & Information, v. 24, n. 5 ( 1996).
https://doi.org/10.1080/09613219608727546
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1995): Application of an alternative contractor selection model. This paper reports on initial results from the application to real‐life of a selection of exercises of an alternative selection model designed to rationalize and simultaneously broaden the scope of this often onerous task. In: Building Research & Information, v. 23, n. 5 ( 1995).
https://doi.org/10.1080/09613219508727473
-
Holt, Gary D. / Olomolaiye, Paul O. / Harris, Frank C. (1993): A conceptual alternative to current tendering practice. Majority of UK construction projects assigned by way of selective competition, an alternative quantitative selection technique has been developed by the authors which could equally apply elsewhere. In: Building Research & Information, v. 21, n. 3 ( 1993).
https://doi.org/10.1080/09613219308727284
-
Akadiri, Peter O. / Olomolaiye, Paul O. / Chinyio, Ezekiel A. (2013): Multi-criteria evaluation model for the selection of sustainable materials for building projects. In: Automation in Construction, v. 30 (März 2013).
https://doi.org/10.1016/j.autcon.2012.10.004
-
Ahadzie, Divine Kwaku / Proverbs, David G. / Olomolaiye, Paul O. / Ankrah, N. (2009): Towards developing competency‐based measures for project managers in mass house building projects in developing countries. In: Construction Management and Economics, v. 27, n. 1 (Januar 2009).
https://doi.org/10.1080/01446190802621028
-
Olomolaiye, Paul O. (1990): An evaluation of the relationships between bricklayers' motivation and productivity. In: Construction Management and Economics, v. 8, n. 3 (September 1990).
https://doi.org/10.1080/01446199000000025
-
Akintoye, Akintola S. / Ajewole, Olusanya / Olomolaiye, Paul O. (1992): Construction cost information management in Nigeria. In: Construction Management and Economics, v. 10, n. 2 (März 1992).
https://doi.org/10.1080/01446199200000011
-
Kometa, Simon T. / Olomolaiye, Paul O. / Harris, Frank C. (1994): Attributes of UK construction clients influencing project consultants' performance. In: Construction Management and Economics, v. 12, n. 5 (September 1994).
https://doi.org/10.1080/01446199400000053
-
Kometa, Simon T. / Olomolaiye, Paul O. / Harris, Frank C. (1995): Quantifying client-generated risk by project consultants. In: Construction Management and Economics, v. 13, n. 2 (März 1995).
https://doi.org/10.1080/01446199500000016
-
Kometa, Simon T. / Olomolaiye, Paul O. / Harris, Frank C. (1996): Validation of the model for evaluating client-generated risk by project consultants. In: Construction Management and Economics, v. 14, n. 2 (März 1996).
https://doi.org/10.1080/014461996373575
-
Zakeri, Mahmood / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1996): A survey of constraints on Iranian construction operatives' productivity. In: Construction Management and Economics, v. 14, n. 5 (September 1996).
https://doi.org/10.1080/014461996373287
-
Kaming, Peter F. / Olomolaiye, Paul O. / Holt, Gary D. / Harris, Frank C. (1997): Factors influencing construction time and cost overruns on high-rise projects in Indonesia. In: Construction Management and Economics, v. 15, n. 1 (Januar 1997).
https://doi.org/10.1080/014461997373132
-
Chinyio, Ezekiel A. / Olomolaiye, Paul O. / Kometa, Simon T. / Harris, Frank C. (1998): A needs-based methodology for classifying construction clients and selecting contractors. In: Construction Management and Economics, v. 16, n. 1 (Januar 1998).
https://doi.org/10.1080/014461998372628
-
Chinyio, Ezekiel A. / Olomolaiye, Paul O. (1999): A needs based methodology for classifying construction clients and selecting contractors-a rejoinder. In: Construction Management and Economics, v. 17, n. 4 (Juli 1999).
https://doi.org/10.1080/014461999371330