George Okere
- Reliance on and Reliability of the Engineer's Estimate in Heavy Civil Projects. In: Construction Economics and Building, v. 17, n. 2 (Juni 2017). (2017):
- An Evaluation of a Predictive Conceptual Method for Contract Time Determination on Highway Projects Based on Project Types. In: International Journal of Civil Engineering, v. 17, n. 7 (Juli 2019). (2019):
- Evaluating the allocation of contingency on state DOT projects based on project types and rate of cost overruns. In: Asian Journal of Civil Engineering, v. 19, n. 4 (März 2018). (2018):