Shigeru Nishitake
- Water Cut-off System Of Mechanical Shield Docking Method. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1993, n. 468 (Juni 1993). (1993):
- Development Of Mechanical Shield Docking Method. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1993, n. 474 (September 1993). (1993):
- Development On Thrust Ram System For Tunnel Boring Machine (tbm) By Using Parallel Link. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 540 (Juni 1996). (1996):
- Study On Tunnel Face Stabilization By X-ray Radiography Method. Approach By Three Dimensional Strain Analysis. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 547 (September 1996). (1996):
- Study On Acting Forces To The Disk Cutters During Excavation By Using Tbm-interaction Forces Between Rock And Disk Cutters. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 554 (Dezember 1996). (1996):
- A Study On Tunnel Face Stabilization By Tank Test. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1999, n. 624 (Juni 1999). (1999):