James C. Ni
- Monitoring and Modeling Grout Efficiency of Lifting Structure in Soft Clay. In: International Journal of Geomechanics, v. 10, n. 6 (Dezember 2010). (2010):
- Experimental and Analytical Modeling of Shield Segment under Cyclic Loading. In: International Journal of Geomechanics, v. 17, n. 6 (Juni 2017). (2017):
- Investigation into factors affecting jacking force: a case study. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 170, n. 4 (August 2017). (2017):
- Quality control of double fluid jet grouting below groundwater table: Case history. In: Soils and Foundations, v. 54, n. 6 (Dezember 2014). (2014):
- A simple data reduction method for pumping tests with tidal, partial penetration, and storage effects. In: Soils and Foundations, v. 53, n. 6 (Dezember 2013). (2013):
- Modelling liner forces response to very close-proximity tunnelling in soft alluvial deposits. In: Tunnelling and Underground Space Technology, v. 103 (September 2020). (2020):
- Lubrication performance of pipejacking in soft alluvial deposits. In: Tunnelling and Underground Space Technology, v. 91 (September 2019). (2019):
- Assessment of concrete maturity and overturning mechanism of primary diaphragm walls in very soft clay during cold winter. In: KSCE Journal of Civil Engineering, v. 20, n. 4 (Dezember 2014). (2014):
- simple approach for characterising tunnel bore conditions based upon pipe-jacking data. In: Tunnelling and Underground Space Technology, v. 71 (Januar 2018). (2018):
- Characterising the failure pattern of a station box of Taipei Rapid Transit System (TRTS) and its rehabilitation. In: Tunnelling and Underground Space Technology, v. 32 (November 2012). (2012):
- Steering characteristics of microtunnelling in various deposits. In: Tunnelling and Underground Space Technology, v. 28 (März 2012). (2012):
- Shield machine disassembly in grouted soils outside the ventilation shaft: A case history in Taipei Rapid Transit System (TRTS). In: Tunnelling and Underground Space Technology, v. 26, n. 2 (März 2011). (2011):
- Alternative Shoring for Mitigation of Pier-Foundation Excavation Disturbance to an Existing Freeway. In: Journal of Performance of Constructed Facilities (ASCE), v. 31, n. 5 (Oktober 2017). (2017):