Thomas Ng
- (2021): Modeling and Analysis of a Glass Façade Robot. In: Buildings, v. 11, n. 6 (21 Mai 2021).
- Using an adaptive genetic algorithm to improve construction finance decisions. In: Engineering, Construction and Architectural Management, v. 8, n. 1 (Januar 2001). (2001):
- Targeting optimum value in public sector projects through "best value"‐focused contractor selection. In: Engineering, Construction and Architectural Management, v. 10, n. 6 (Dezember 2003). (2003):
- Reducing building life cycle carbon emissions through prefabrication: Evidence from and gaps in empirical studies. In: Building and Environment, v. 132 (März 2018). (2018):
- Client satisfaction and quality management systems in contractor organizations. In: Building and Environment, v. 41, n. 11 (November 2006). (2006):
- Curing congenital construction industry disorders through relationally integrated supply chains. In: Building and Environment, v. 38, n. 4 (April 2003). (2003):
- (2008): Costs and Benefits of ISO9000-based Quality Management Systems to Construction Contractors. In: Australasian Journal of Construction Economics and Building, v. 8, n. 2 (November 2008).
- Capitalising Experiential Knowledge for Guiding Construction Procurement Selection. In: Australasian Journal of Construction Economics and Building, v. 5, n. 1 (November 2005). (2005):
- Decision Criteria and Their Subjectivity in Construction Procurement Selection. In: Australasian Journal of Construction Economics and Building, v. 2, n. 1 (November 2002). (2002):
- Australian project time–cost analysis: statistical analysis of intertemporal trends. In: Construction Management and Economics, v. 19, n. 5 (September 2001). (2001):
- Australian project time‐cost analysis: Statistical analysis of intertemporal trends. In: Construction Management and Economics, v. 19, n. 5 (September 2001). (2001):
- An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. In: Construction Management and Economics, v. 19, n. 1 (Januar 2001). (2001):
- The application of the ant colony optimization algorithm to the construction site layout planning problem. In: Construction Management and Economics, v. 25, n. 4 (April 2007). (2007):
- Enhancing public engagement in a fast-paced project environment. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 169, n. 6 (November 2016). (2016):