Nuno Neves
- Berkeley Hotel Tensioning Sequence of the Exposed Steel Structure. In: ce/papers, v. 7, n. 1-2 (März 2024). (2024):
- Complexe Sportive de Meudon – Structural Design and Construction. In: ce/papers, v. 5, n. 2 (April 2022). (2022):
- Seismic analysis and strengthening of Pico Island Churches. In: Bulletin of Earthquake Engineering, v. 10, n. 1 (Dezember 2011). (2011):
- Seismic analysis of a building block. In: Bulletin of Earthquake Engineering, v. 10, n. 1 (Dezember 2011). (2011):
- Design and construction method of the new Coimbra footbridge. Vorgetragen bei: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):