Tushar Nath
- Critical success factors for BIM adoption during construction phase: a Singapore case study. In: Engineering, Construction and Architectural Management, v. 29, n. 9 (August 2022). (2022):
- Productivity improvement of precast shop drawings generation through BIM-based process re-engineering. In: Automation in Construction, v. 54 (Juni 2015). (2015):