Pilate Moyo
- (2021): Predicting the Effects of Climate Change on Water Temperatures of Roode Elsberg Dam Using Nonparametric Machine Learning Models. In: Infrastructures, v. 6, n. 2 (Februar 2021).
- Interaction between corrosion crack width and steel loss in RC beams corroded under load. In: Cement and Concrete Research, v. 40, n. 9 (September 2010). (2010):
- Application of Box-Jenkins Models for Assessing the Effect of Unusual Events Recorded by Structural Health Monitoring Systems. In: Structural Health Monitoring, v. 1, n. 2 (Juni 2002). (2002):
- Highway bridge live loading assessment and load carrying capacity estimation using a health monitoring system. In: Structural Engineering and Mechanics, v. 18, n. 5 (November 2004). (2004):
- Modelling and integrity assessment of shear connectors in precast cast-in-situ concrete bridges. In: Structural Engineering and Mechanics, v. 42, n. 1 (April 2012). (2012):
- Behaviour of RC beams corroded under sustained service loads. In: Construction and Building Materials, v. 23, n. 11 (November 2009). (2009):
- Lateral deformation of RC beams under simultaneous load and steel corrosion. In: Construction and Building Materials, v. 24, n. 1 (Januar 2010). (2010):
- Variation of steel loss and its effect on the ultimate flexural capacity of RC beams corroded and repaired under load. In: Construction and Building Materials, v. 24, n. 6 (Juni 2010). (2010):
- Model for cover cracking of RC beams due to partial surface steel corrosion. In: Construction and Building Materials, v. 25, n. 2 (Februar 2011). (2011):
- Influence of corrosion crack patterns on the rate of crack widening of RC beams. In: Construction and Building Materials, v. 25, n. 5 (Mai 2011). (2011):
- Serviceability of corrosion-affected RC beams after patch repairs and FRPs under load. In: Materials and Structures, v. 44, n. 1 (Januar 2011). (2011):
- Durability performance of a range of marine concretes and the applicability of the South African Service Life Prediction Model. In: Materials and Structures, v. 45, n. 1-2 (Januar 2012). (2012):
- Load-bearing capacity of corroded, patched and FRP-repaired RC beams. In: Magazine of Concrete Research, v. 63, n. 11 (November 2011). (2011):
- Structural performance assessment and fatigue analysis of a railway bridge. In: Structure and Infrastructure Engineering, v. 6, n. 5 (Oktober 2010). (2010):
- Longitudinal strains and stiffness of RC beams under load as measures of corrosion levels. In: Engineering Structures, v. 35 (Februar 2012). (2012):
- Steel corrosion on RC structures under sustained service loads — A critical review. In: Engineering Structures, v. 31, n. 11 (November 2009). (2009):
- A variable mass model for describing load impulses due to periodic jumping. In: Engineering Structures, v. 30, n. 6 (Juni 2008). (2008):
- Assessment of Highway Bridge Upgrading by Dynamic Testing and Finite-Element Model Updating. In: Journal of Bridge Engineering (ASCE), v. 8, n. 3 (Mai - Juni 2003). (2003):