J. H. Moon
- Post-Tensioned Interior Precast Wide Beam—Column Connections Subjected to Lateral Loading. In: Advances in Structural Engineering, v. 10, n. 5 (Oktober 2007). (2007):
- Bridge construction above existing underground railway tunnels – A case study from Cheong-Gye Cheon restoration project. In: Tunnelling and Underground Space Technology, v. 21, n. 3-4 (Mai 2006). (2006):