Valeh Moayeri
- Design Change Management Using BIM-based Visualization Model. In: International Journal of Architecture Engineering and Construction, v. 6, n. 1 (März 2017). (2017):
- BIM-based model for quantifying the design change time ripple effect. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 8 (August 2017). (2017):