Chikara Miyashita
- Some Considerations On The Erection Of Bridge Girders By Use Of Floating Crane Barge And Its Dynamic Behavior In Long-period Waves. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 540 (Juni 1996). (1996):
- Quality control at erection site of Iwakuorjima bridge. Vorgetragen bei: IABSE Symposium: Safety and Quality Assurance of Civil Engineering Structures = Sécurité et assurance de la qualité des structures de génie civil = Sicherheit und Qualitätssicherung von Ingenieurbauwerken, Tokio, Japan, 1986. (1986):
- 複合斜張橋「生口橋」の設計と施工 (Design and Construction of Complex Cable-Stayed Bridge for Ikuchi Bridge). In: Concrete Journal (JCI), v. 30, n. 2 ( 1992). (1992):
- Non-destructive inspection system for welded portions of the Honshu-Shikoku Bridges. Vorgetragen bei: IABSE Symposium: Extending the Lifespan of Structures, San Francisco, CA, USA, August 1995. (1995):