Wail Menesi
- Multimode Resource-Constrained Scheduling and Leveling for Practical-Size Projects. In: Journal of Management in Engineering (ASCE), v. 31, n. 6 (November 2015). (2015):
- Fast and Near-Optimum Schedule Optimization for Large-Scale Projects. In: Journal of Construction Engineering and Management, v. 139, n. 9 (September 2013). (2013):
- Heuristic Method for Satisfying Both Deadlines and Resource Constraints. In: Journal of Construction Engineering and Management, v. 138, n. 6 (Juni 2012). (2012):
- Delay Analysis under Multiple Baseline Updates. In: Journal of Construction Engineering and Management, v. 134, n. 8 (August 2008). (2008):
- Critical Path Segments Scheduling Technique. In: Journal of Construction Engineering and Management, v. 136, n. 10 (Oktober 2010). (2010):
- Enhancing the critical path segments scheduling technique for project control. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 9 (September 2012). (2012):