John W. Melin
- Post: Problem-Oriented Subroutine Translator. In: Journal of the Structural Division (ASCE), v. 92, n. 6 (Dezember 1966). (1966):
- Experience with POL Environment. In: Journal of the Structural Division (ASCE), v. 97, n. 1 (Januar 1971). (1971):
- Constraint Processing in Design. In: Journal of the Structural Division (ASCE), v. 97, n. 1 (Januar 1971). (1971):
- Tower: Design System for Guyed Towers. In: Journal of the Structural Division (ASCE), v. 97, n. 1 (Januar 1971). (1971):
- Environment for Problem-Oriented Languages. In: Journal of the Structural Division (ASCE), v. 92, n. 6 (Dezember 1966). (1966):
- Time constraints set by prime contractors for their sub‐contractors. Methods that prime contractors use in allocating time windows for their sub‐contractors are examined. The major activities are discussed and divided into pacing and non‐pacing types. In: Building Research & Information, v. 24, n. 5 ( 1996). (1996):
- Prepayment Ability to Offset Inflation. In: Journal of Construction Engineering and Management, v. 112, n. 4 (Dezember 1986). (1986):