Øystein Mejlænder-Larsen
- A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. In: Engineering, Construction and Architectural Management, v. 26, n. 4 (Mai 2019). (2019):
- Using a change control system and building information modelling to manage change in design. In: Architectural Engineering and Design Management, v. 13, n. 1 (Dezember 2016). (2016):