Kris G. Mattila
- Linear scheduling: past research efforts and future directions. In: Engineering, Construction and Architectural Management, v. 5, n. 3 (März 1998). (1998):
- The Pavement Enterprise at Michigan Technological University. In: Journal of Professional Issues in Engineering Education and Practice, v. 130, n. 3 (Juli 2004). (2004):
- Resource Leveling of Linear Schedules Using Integer Linear Programming. In: Journal of Construction Engineering and Management, v. 124, n. 3 (Mai 1998). (1998):
- Accuracy of Highway Contractor's Schedules. In: Journal of Construction Engineering and Management, v. 130, n. 5 (Oktober 2004). (2004):
- Comparison of Linear Scheduling Model and Repetitive Scheduling Method. In: Journal of Construction Engineering and Management, v. 129, n. 1 (Februar 2003). (2003):
- Binary Resource Leveling Model: Activity Splitting Allowed. In: Journal of Construction Engineering and Management, v. 130, n. 6 (Dezember 2004). (2004):
- Determination of Haul Distance and Direction in Mass Excavation. In: Journal of Construction Engineering and Management, v. 131, n. 3 (März 2005). (2005):
- Nonlinear cash flow optimization model. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 11 (November 2006). (2006):