Yasunori Matsuoka
- Inverted Casting Method Of Concrete Wall Using Al-flake. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1985, n. 355 (März 1985). (1985):
- Development Of Highly Durable Permanent Formwork By Polymer Impregnated Concrete System. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1991, n. 435 (September 1991). (1991):
- Simulation Of Chloride Movement In Hardened Concrete. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1992, n. 442 (Februar 1992). (1992):
- Development Of Highly Durable Permanent Formwork By Polymer Impregnated Concrete System. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1993, n. 474 (September 1993). (1993):
- Durability Assessment Of Binders By Analyzing Liquid And Solid Phase. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1993, n. 478 (November 1993). (1993):
- Modeling Of Chloride Ion Movement At The Surface Layer Of Hardened Concrete. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1998, n. 585 (Februar 1998). (1998):
- Study On Application Of High Strength And Self-compacting Concrete For The Underground Diaphragm Wall. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2000, n. 641 (Februar 2000). (2000):
- 鋼管充てん工法 (Placing of Concrete into Steel Tubular Columns). In: Concrete Journal (JCI), v. 33, n. 4 ( 1995). (1995):
- 本州四国連絡橋工事用PCバージの設計と建造 (Design and Construction of Prestressed Concrete Barge using in Construction of Bridges between Honshu and Shikoku). In: Concrete Journal (JCI), v. 21, n. 8 ( 1983). (1983):
- 東扇島LNG地下式貯槽の施工. Construction Of Underground Lng Storage Tank In Higashi Ohgishima). In: Concrete Journal (JCI), v. 20, n. 4 ( 1982). (1982):
- コンクリートバージC-BOAT500の建造 (Construction of Concrete Barge C-BOAT 500). In: Concrete Journal (JCI), v. 16, n. 11 ( 1978). (1978):
- Development of Combination-Type Self-Compacting Concrete and Evaluation Test Methods. In: Journal of Advanced Concrete Technology, v. 1, n. 1 ( 2003). (2003):