Luong Duc Long
- A non-unit repetitive construction project scheduling with uncertainties. In: Automation in Construction, v. 164 (August 2024). (2024):
- An AI-driven model for predicting and optimizing energy-efficient building envelopes. In: Alexandria Engineering Journal, v. 79 (September 2023). (2023):
- Enhancing accuracy in cost estimation for façade works: integration of case-based reasoning, random forest, and artificial neural network techniques. In: Asian Journal of Civil Engineering, v. 25, n. 2 (Oktober 2023). (2023):
- Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. In: Engineering, Construction and Architectural Management, v. 25, n. 5 (Juni 2018). (2018):
- A genetic algorithm-based method for scheduling repetitive construction projects. In: Automation in Construction, v. 18, n. 4 (Juli 2009). (2009):