Yu-Cheng Lin
- Developing Case-Based Communities of Practice for Teaching the Legal Aspects of Construction: Lessons Learned in Taiwan. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 4 (November 2009). (2009):
- Developing WSN/BIM-Based Environmental Monitoring Management System for Parking Garages in Smart Cities. In: Journal of Management in Engineering (ASCE), v. 36, n. 3 (Mai 2020). (2020):
- Laying out the occupant flows in public buildings for operating efficiency. In: Building and Environment, v. 51 (Mai 2012). (2012):
- Developing Construction Defect Management System Using BIM Technology in Quality Inspection. In: Journal of Civil Engineering and Management, v. 22, n. 7 (Juli 2016). (2016):
- Developing As-built BIM Model Process Management System for General Contractors: A Case Study. In: Journal of Civil Engineering and Management, v. 22, n. 5 (Mai 2016). (2016):
- Use of BIM Approach to Enhance Construction Interface Management: A Case Study. In: Journal of Civil Engineering and Management, v. 21, n. 2 (Januar 2015). (2015):
- Construction 3d Bim-based Knowledge Management System: A Case Study. In: Journal of Civil Engineering and Management, v. 20, n. 2 (April 2014). (2014):
- The Analysis of BOT Strategies Based on Game Theory – Case Study on Taiwan's High Speed Railway Project. In: Journal of Civil Engineering and Management, v. 18, n. 5 (September 2012). (2012):
- Enhancing Construction Interface Management Using Multilevel Interface Matrix Approach/ Ryšių vadybos statyboje gerinimas taikant įvairialygių ryšių matricos metodą. In: Journal of Civil Engineering and Management, v. 18, n. 1 (Februar 2012). (2012):
- Structure Development and Performance Evaluation of Construction Knowledge Management System/ Statybų žinių valdymo sistema: struktūros kūrimas ir efektyvumo įvertinimas. In: Journal of Civil Engineering and Management, v. 17, n. 2 (Juli 2011). (2011):
- A Framework for Collaboration Management of BIM Model Creation in Architectural Projects. In: Journal of Asian Architecture and Building Engineering, v. 17, n. 1 (Januar 2018). (2018):
- (2015): Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study. In: Buildings, v. 6, n. 1 (Dezember 2015).
- (2019): Construction Database-Supported and BIM-Based Interface Communication and Management: A Pilot Project. In: Advances in Civil Engineering, v. 2019 ( 2019).
- Mobile Construction Supply Chain Management Using PDA and Bar Codes. In: Computer-Aided Civil and Infrastructure Engineering, v. 20, n. 4 (Juli 2005). (2005):
- Construction network-based interface management system. In: Automation in Construction, v. 30 (März 2013). (2013):
- Developing project communities of practice-based knowledge management system in construction. In: Automation in Construction, v. 22 (März 2012). (2012):
- Developing an activity-based knowledge management system for contractors. In: Automation in Construction, v. 13, n. 6 (November 2004). (2004):
- Developing construction assistant experience management system using people-based maps. In: Automation in Construction, v. 17, n. 8 (November 2008). (2008):
- Enhancing knowledge exchange through web map-based knowledge management system in construction: Lessons learned in Taiwan. In: Automation in Construction, v. 15, n. 6 (November 2006). (2006):
- Developing mobile 2D barcode/RFID-based maintenance management system. In: Automation in Construction, v. 37 (Januar 2014). (2014):
- Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. In: Journal of Construction Engineering and Management, v. 140, n. 1 (Januar 2014). (2014):