Chien-Liang Lin
- An Improved Time-cost Trade-Off Model with Optimal Labor Productivity. In: Journal of Civil Engineering and Management, v. 26, n. 2 (Februar 2020). (2020):
- Evaluation of CART, CHAID, and QUEST Algorithms: A Case Study of Construction Defects in Taiwan. In: Journal of Asian Architecture and Building Engineering, v. 18, n. 6 (November 2019). (2019):
- Performance Measurement in the Public Sector: Example of the Building Administration Authorities in Taiwan. In: Journal of Management in Engineering (ASCE), v. 30, n. 1 (Januar 2014). (2014):
- Examining Association Between Construction Inspection Grades and Critical Defects Using Data Mining and Fuzzy Logic. In: Journal of Civil Engineering and Management, v. 24, n. 4 (Juli 2018). (2018):
- Improved Baseline Productivity Analysis Technique. In: Journal of Construction Engineering and Management, v. 136, n. 3 (März 2010). (2010):