Duanshun Li
- Classical Planning Model-Based Approach to Automating Construction Planning on Earthwork Projects. In: Computer-Aided Civil and Infrastructure Engineering, v. 34, n. 4 (März 2019). (2019):
- Sewer damage detection from imbalanced CCTV inspection data using deep convolutional neural networks with hierarchical classification. In: Automation in Construction, v. 101 (Mai 2019). (2019):
- Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach. In: Journal of Construction Engineering and Management, v. 143, n. 1 (Januar 2017). (2017):
- Integrating geometric models, site images and GIS based on Google Earth and Keyhole Markup Language. In: Automation in Construction, v. 89 (Mai 2018). (2018):