Kenneth Leitch
- Installation of 42 Kw Solar Photovoltaics and 50 Kw Wind Turbine Systems. In: Journal of Green Building, v. 8, n. 3 (Juli 2013). (2013):
- (2012): Structural Behavior and Design of Barrier-Overhang Connection in Concrete Bridge Superstructures Using AASHTO LRFD Method. In: Advances in Civil Engineering, v. 2012 ( 2012).
- (2012): Optimization of Post-Tensioned Box Girder Bridges with Special Reference to Use of High-Strength Concrete Using AASHTO LRFD Method. In: Advances in Civil Engineering, v. 2012 ( 2012).
- (2015): Experimental Heat Transfer Study on Green Roofs in a Semiarid Climate during Summer. In: Journal of Construction Engineering, v. 2015 ( 2015).