0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Die folgende Bibliografie enthält alle in dieser Datenbank indizierten Veröffentlichungen, die mit diesem Namen als Autor, Herausgeber oder anderweitig Beitragenden verbunden sind.

  1. Tran, Si Van-Tien / Lee, Doyeop / Pham, Hai Chien / Dang, Long H. / Park, Chansik / Lee, Ung-Kyun (2024): Leveraging BIM for Enhanced Camera Allocation Planning at Construction Job Sites: A Voxel-Based Site Coverage and Overlapping Analysis. In: Buildings, v. 14, n. 6 (19 Juni 2024).

    https://doi.org/10.3390/buildings14061880

  2. An, Sung-Hoon / Lee, Ung-Kyun (2017): 건축프로젝트 현장 조직 커뮤니케이션이 성과에 미치는 영향 (Influence of Site Organization's Communication on Performance of Building Construction Projects). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 17, n. 4 (August 2017).

    https://doi.org/10.5345/jkibc.2017.17.4.361

  3. Lee, Ung-Kyun / Seo, Deok-Seok (2017): 공동주택 마감공사의 하자보수기간 현황 및 연관성 연구 (Study on the Defects of Finishing Works of Apartment Houses during Warranty Liability Period and its Correlation). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 17, n. 4 (August 2017).

    https://doi.org/10.5345/jkibc.2017.17.4.385

  4. Kim, Jae-Yeob / Park, Byeong-Hun / Lee, Ung-Kyun (2016): 중공 PC기둥 복합공법의 편익-비용 분석 (Benefit·Cost Analysis of Combine Method Using Hollow Precast Concrete Column). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 5 (Oktober 2016).

    https://doi.org/10.5345/jkibc.2016.16.5.429

  5. Kim, Dae-Gil / Lee, Ung-Kyun / Lee, Hak-Ju (2015): 공공공사의 발주방식선정을 위한 의사결정요인 연구 (Determining Decision-making Factors for the Selection of Contract Methods in Public Construction). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 4 (August 2015).

    https://doi.org/10.5345/jkibc.2015.15.4.405

  6. Lee, Ung-Kyun (2015): Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 3 (Juni 2015).

    https://doi.org/10.5345/jkibc.2015.15.3.339

  7. Seo, Deok-Seok / Lee, Ung-Kyun (2015): 통계분석을 이용한 공동주택 하자보수보증금 특성 분석 (Characteristic Analysis of Utilization of Security Deposit for Repairing Defects Using Statistical Analysis). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 2 (April 2015).

    https://doi.org/10.5345/jkibc.2015.15.2.209

  8. Kim, Jae-Yeob / Lee, Ung-Kyun (2015): 건축공사용 중국산 화강석의 명칭혼란 개선방안 (Improvement on the Non-standardized Name Use of Chinese Granite for Korean Building Constructions). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 15, n. 1 (Februar 2015).

    https://doi.org/10.5345/jkibc.2015.15.1.081

  9. Shin, Seungil / Lee, Ung-Kyun / Cho, Hunhee / Kang, Kyung-In (2014): 도시재생 사업의 매몰비용에 관한 이해집단간의 의식조사 연구 (A Study on the Perception of Stakeholders on Sunken Costs of an Urban Development Project). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 6 (Dezember 2014).

    https://doi.org/10.5345/jkibc.2014.14.6.591

  10. Lee, Ung-Kyun / Jeong, Hyung Seok David / Woldesenbet, Asregedew (2014): Assessment of Requirements for Successful Mobile Project Management Information Systems. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 14, n. 1 (Februar 2014).

    https://doi.org/10.5345/jkibc.2014.14.1.045

  11. Seo, Deok-Seok / Lee, Ung-Kyun (2013): An analysis of the utilization of defect deposits for apartment complexes. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 6 (Dezember 2013).

    https://doi.org/10.5345/jkibc.2013.13.6.549

  12. An, Sung-Hoon / Zhang, Zhen / Lee, Ung-Kyun (2013): Correlation Analysis between Job Stress and Job Satisfaction of Building Construction Field Managers. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 5 (Oktober 2013).

    https://doi.org/10.5345/jkibc.2013.13.5.474

  13. Lee, Ung-Kyun / Yoo, Wi Sung / An, Sung-Hoon / Doh, Nakju / Cho, Hunhee / Jun, Changhyun / Kim, Taehoon / Lee, Young Hoon (2013): Performance assessment model for robot-based automated construction systems. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 4 (August 2013).

    https://doi.org/10.5345/jkibc.2013.13.4.416

  14. Yoo, Wi Sung / Lee, Ung-Kyun (2013): Development of Expertise-based Safety Performance Evaluation Model. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 2 (April 2013).

    https://doi.org/10.5345/jkibc.2013.13.2.159

  15. Kim, Tae-Hoon / Lee, Myung-Do / Lee, Ung-Kyun / Cho, Hun-Hee / Kang, Kyung-In (2011): 초고층 시스템거푸집 공사의 태양광에너지 활용 방안 연구 (Photovoltaic Application in System Formwork Operations of High-rise Building Construction). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 11, n. 2 (April 2011).

    https://doi.org/10.5345/jkic.2011.04.2.116

  16. Lee, Ung-Kyun / Kang, Kyung-In (2007): 건물 자동화 시공 시스템 개발 방향에 관한 연구 (The Study on the Suggestion of Development Guideline for Automated Building Construction System). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 7, n. 3 (September 2007).

    https://doi.org/10.5345/jkic.2007.7.3.067

  17. Kim, Bum-Ki / Suk, Sung-Joon / Lee, Ung-Kyun / An, Sung-Hoon / Kang, Kyung-In (2005): 초고층 주상복합 프리캐스트 콘크리트 구조물의 경제성 분석에 관한 연구 (A study on the economic analysis of high-rise residential-commercial building that is made by precast concrete). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 5, n. 1 (März 2005).

    https://doi.org/10.5345/jkic.2005.5.1.089

  18. Lee, Myungdo / Lee, Ung-Kyun (2020): A Framework for Evaluating an Integrated BIM ROI Based on Preventing Rework in the Construction Phase. In: Journal of Civil Engineering and Management, v. 26, n. 5 (7 Mai 2020).

    https://doi.org/10.3846/jcem.2020.12185

  19. Kim, Gwang-Hee / Lee, Ung-Kyun / Park, U-Yeol / Kim, Jae-Yeob / Kang, Kyung-In (2005): Modified braced wall system with pre-stressed wale for excavation in urban areas. In: Building and Environment, v. 40, n. 12 (Dezember 2005).

    https://doi.org/10.1016/j.buildenv.2004.12.007

  20. Kim, Chang-Jun / Yoo, Wi Sung / Lee, Ung-Kyun / Song, Ki-Jun / Kang, Kyung-In / Cho, Hunhee (2010): An experience curve-based decision support model for prioritizing restoration needs of cultural heritage. In: Journal of Cultural Heritage, v. 11, n. 4 (Oktober 2010).

    https://doi.org/10.1016/j.culher.2010.03.004

  21. Lee, Ung-Kyun / Kang, Kyung-In / Kim, Gwang-Hee (2006): Mass Concrete Curing Management Based on Ubiquitous Computing. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 2 (Februar 2006).

    https://doi.org/10.1111/j.1467-8667.2005.00423.x

  22. Lee, Ung-Kyun / Kang, Kyung-In / Kim, Gwang-Hee / Cho, Hun-Hee (2006): Improving Tower Crane Productivity Using Wireless Technology. In: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 8 (November 2006).

    https://doi.org/10.1111/j.1467-8667.2006.00459.x

  23. Lee, Ung-Kyun / Kim, Joo-Heon / Cho, Hunhee / Kang, Kyung-In (2009): Development of a mobile safety monitoring system for construction sites. In: Automation in Construction, v. 18, n. 3 (Mai 2009).

    https://doi.org/10.1016/j.autcon.2008.08.002

  24. Lee, Ung-Kyun / Jeong, David Hyung Seok / Ju, Ki-beom / Han, Choonghan (2011): Multi-layered assessment of emerging internet based business for construction product information. In: Automation in Construction, v. 20, n. 7 (November 2011).

    https://doi.org/10.1016/j.autcon.2011.03.006

  25. Lee, Myungdo / Kim, Taehoon / Jung, Hong-Ku / Lee, Ung-Kyun / Cho, Hunhee / Kang, Kyung-In (2014): Green construction hoist with customized energy regeneration system. In: Automation in Construction, v. 45 (September 2014).

    https://doi.org/10.1016/j.autcon.2014.05.001

  26. Kim, Chang-Won / Kim, Taehoon / Lee, Ung-Kyun / Cho, Hunhee / Kang, Kyung-In (2016): Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers. In: Journal of Construction Engineering and Management, v. 142, n. 4 (April 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001090

  27. Kim, Taehoon / Lim, Hyunsu / Lee, Ung-Kyun / Cha, Minsoo / Cho, Hunhee / Kang, Kyung-In (2012): Advanced formwork method integrated with a layout planning model for tall building construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 11 (November 2012).

    https://doi.org/10.1139/l2012-104

  28. Seo, Jangwoo / Yoo, Wi Sung / Lee, Ung-Kyun / Kim, Chunhak / Kang, Kyung-In / Cho, Hunhee (2010): Case study of a synchronous hydraulic jack-up system for constructing high-rise residential buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 6 (Juni 2010).

    https://doi.org/10.1139/l10-026

  29. Kim, Taehoon / Lee, Ung-Kyun / Kim, Seung Woo / Lim, Hyunsu / Kim, Chang-Won / Cho, Hunhee / Kang, Kyung-In (2018): Flexible double-cage hoist for high operational efficiency in tall building construction. In: Automation in Construction, v. 96 (Dezember 2018).

    https://doi.org/10.1016/j.autcon.2018.09.023

Eine Veröffentlichung suchen...

Nur verfügbar mit
Mein Structurae

Volltext
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine