Hohsing Lee
- Sidney Lanier Bridge, Georgia. In: Transportation Research Record: Journal of the Transportation Research Board, v. 1696, n. 1 (Januar 2000). (2000):
- (2018): Precast Segmental Aerial Guideway for Honolulu Rail Transit Corridor Project. Vorgetragen bei: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- Structural Challenges in the Design of Three Pedestrian Bridges. Vorgetragen bei: Structures Congress 2017, April 6–8, 2017, Denver, Colorado. (2017):
- (2017): Innovative Solutions to Seismic Design Challenges for the SFOBB I-80 WB Ramps at Yerba Buena Island. Vorgetragen bei: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- (2017): Latest Practices for Existing Long-Span Suspension Bridges. Vorgetragen bei: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.
- (2016): Innovative Design for the SFOBB I-80 Yerba Buena Island WB Ramps. Vorgetragen bei: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- Poetic Crossing. In: Civil Engineering Magazine, v. 74, n. 8 (August 2004). (2004):