Laurence Le Baron
- The temporary stay construction method for arch bridges. La construction des ponts en arc par haubanage provisoire. Vorgetragen bei: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994. (1994):
- The temporary stay progressive construction method. La construction à l'avancement par haubanage provisoire. Vorgetragen bei: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994. (1994):