Jessica Lamond
- Infrastructure procurement capacity gaps in Nigeria public sector institutions. In: Engineering, Construction and Architectural Management, v. 26, n. 9 (September 2019). (2019):
- Life-cycle assessment environmental sustainability in bridge design and maintenance. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 173, n. 7 (Oktober 2020). (2020):
- Technical considerations in green roof retrofit for stormwater attenuation in the Central Business District. In: Structural Survey, v. 33, n. 1 (November 2015). (2015):
- Application of the concept of cost benefits analysis (CBA) to property level flood risk adaptation measures. A conceptual framework for residential. In: Structural Survey, v. 32, n. 2 (Mai 2014). (2014):
- An analysis of the costs of resilient reinstatement of flood affected properties. A case study of the 2009 flood event in Cockermouth. In: Structural Survey, v. 29, n. 4 (August 2011). (2011):
- Does the price impact of flooding fade away?. In: Structural Survey, v. 24, n. 5 (Oktober 2006). (2006):
- Measuring flood resilience: a fuzzy logic approach. In: International Journal of Building Pathology and Adaptation, v. 35, n. 5 (November 2017). (2017):
- Sustainability of Bridge Maintenance. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 172, n. 1 (März 2019). (2019):