- Future changes in urban drainage pressure caused by precipitation extremes in 285 cities across China based on CMIP6 models. In: Sustainable Cities and Society, v. 91 (April 2023). (2023):
- Project Resource Input Optimization Problem with Combined Time Constraints Based on Node Network Diagram and Constraint Programming. In: Journal of Construction Engineering and Management, v. 147, n. 12 (Dezember 2021). (2021):
- Resource-Constrained Project Scheduling Problem under Multiple Time Constraints. In: Journal of Construction Engineering and Management, v. 147, n. 2 (Februar 2021). (2021):