Simon T. Kometa
- An evaluation of clients' needs and responsibilities in the construction process. In: Engineering, Construction and Architectural Management, v. 2, n. 1 (Januar 1995). (1995):
- Project managers’ perception of production problems — An Indonesian case study. Lack of material was considered of most importance to productivity problems whilst re‐work was equally a problem under kendall concordance analysis. In: Building Research & Information, v. 24, n. 5 ( 1996). (1996):
- Attributes of UK construction clients influencing project consultants' performance. In: Construction Management and Economics, v. 12, n. 5 (September 1994). (1994):
- Quantifying client-generated risk by project consultants. In: Construction Management and Economics, v. 13, n. 2 (März 1995). (1995):
- Validation of the model for evaluating client-generated risk by project consultants. In: Construction Management and Economics, v. 14, n. 2 (März 1996). (1996):
- A needs-based methodology for classifying construction clients and selecting contractors. In: Construction Management and Economics, v. 16, n. 1 (Januar 1998). (1998):