Yongho Ko
- Fleet management for earthmoving operation in the phase of detail estimation using mixed integer nonlinear programming. In: Journal of Asian Architecture and Building Engineering. :
- Methodology for construction-standard-production-rate-based simulation modeling and production-rate data generation. In: Journal of Asian Architecture and Building Engineering, v. 23, n. 2 (Dezember 2023). (2023):
- Housing Market Trend Forecasts through Statistical Comparisons based on Big Data Analytic Methods. In: Journal of Management in Engineering (ASCE), v. 34, n. 2 (März 2018). (2018):
- Development of Construction Performance Monitoring Methodology using the Bayesian Probabilistic Approach. In: Journal of Asian Architecture and Building Engineering, v. 14, n. 1 (Januar 2015). (2015):
- Implementation of Construction Performance Database Prototype for Curtain Wall Operation in High-Rise Building Construction. In: Journal of Asian Architecture and Building Engineering, v. 13, n. 1 (Januar 2014). (2014):
- Home sales index prediction model based on cluster and principal component statistical approaches in a big data analytic concept. In: KSCE Journal of Civil Engineering, v. 21, n. 1 (Mai 2016). (2016):
- Enhancement of Prediction Accuracy for Home Sales Index Prediction Model based on Integration of Multiple Regression Analysis and Genetic Algorithm. In: KSCE Journal of Civil Engineering, v. 22, n. 7 (August 2017). (2017):