Kim, Minju / Kim, Yong-Woo (2024): Applications of blockchain for construction project procurement. In: Automation in Construction, v. 165 (September 2024).
https://doi.org/10.1016/j.autcon.2024.105550
-
Kim, Yong-Woo / Rhee, Byong-Duk (2024): Incentive-based coordination for scheduled delivery in prefab construction. In: Construction Management and Economics, v. 42, n. 7 (Februar 2024).
https://doi.org/10.1080/01446193.2024.2305763
-
Kim, Minju / Zhao, Xianxiang / Kim, Yong-Woo / Rhee, Byong-Duk (2023): Blockchain-enabled supply chain coordination for off-site construction using Bayesian theory for plan reliability. In: Automation in Construction, v. 155 (November 2023).
https://doi.org/10.1016/j.autcon.2023.105061
-
Ho, Chung / Kim, Yong-Woo / Zabinsky, Zelda B. (2022): Prefabrication supply chains with multiple shops: Optimization for job allocation. In: Automation in Construction, v. 136 (April 2022).
https://doi.org/10.1016/j.autcon.2022.104155
-
Kim, Yong-Woo (2017): Analytic solution of Timoshenko beam excited by real seismic support motions. In: Structural Engineering and Mechanics, v. 62, n. 2 (April 2017).
https://doi.org/10.12989/sem.2017.62.2.247
-
Bae, Jin-Woo / Kim, Yong-Woo (2008): Sustainable Value on Construction Projects and Lean Construction. In: Journal of Green Building, v. 3, n. 1 (Februar 2008).
https://doi.org/10.3992/jgb.3.1.156
-
Kang, Goune / Kim, Taehoon / Kim, Yong-Woo / Cho, Hunhee / Kang, Kyung-In (2015): Statistical analysis of embodied carbon emission for building construction. In: Energy and Buildings, v. 105 (Oktober 2015).
https://doi.org/10.1016/j.enbuild.2015.07.058
-
Yi, June-Seong / Kim, Yong-Woo / Lim, Ji Youn / Lee, JeeHee (2017): Activity-based life cycle analysis of a curtain wall supply for reducing its environmental impact. In: Energy and Buildings, v. 138 (März 2017).
https://doi.org/10.1016/j.enbuild.2016.11.061
-
Kim, Yong-Woo / Rhee, Byong-Duk (2020): The Impact of Empowering Front-Line Managers on Planning Reliability and Project Schedule Performance. In: Journal of Management in Engineering (ASCE), v. 36, n. 3 (Mai 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000751
-
Azari-N, Rahman / Kim, Yong-Woo (2012): Comparative assessment of life cycle impacts of curtain wall mullions. In: Building and Environment, v. 48 (Februar 2012).
https://doi.org/10.1016/j.buildenv.2011.09.010
-
Park, Hyoungbae / Kim, Kyeongseok / Kim, Yong-Woo / Kim, Hyoungkwan (2017): Stakeholder Management in Long-Term Complex Megaconstruction Projects: The Saemangeum Project. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (Juli 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000515
-
Azari, Rahman / Kim, Yong-Woo (2016): Integration Evaluation Framework for Integrated Design Teams of Green Buildings: Development and Validation. In: Journal of Management in Engineering (ASCE), v. 32, n. 3 (Mai 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000416
-
Kim, Taehoon / Kim, Yong-Woo / Cho, Hunhee (2016): Customer Earned Value: Performance Indicator from Flow and Value Generation View. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (Januar 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000377
-
Kim, Sang-chul / Kim, Yong-Woo / Park, Kun Soo / Yoo, Choong-Yuel (2015): Impact of Measuring Operational-Level Planning Reliability on Management-Level Project Performance. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000326
-
Kim, Yong-Woo / Ballard, Glenn (2010): Management Thinking in the Earned Value Method System and the Last Planner System. In: Journal of Management in Engineering (ASCE), v. 26, n. 4 (Oktober 2010).
https://doi.org/10.1061/(asce)me.1943-5479.0000026
-
Kim, Byung-Soo / Kim, Yong-Woo (2015): Configuration of Earthwork Equipment Considering Environmental Impacts, Cost and Schedule. In: Journal of Civil Engineering and Management, v. 22, n. 1 (Dezember 2015).
https://doi.org/10.3846/13923730.2014.897964
-
Kim, Sang-chul / Kim, Yong-Woo (2014): Computerized Integrated Project Management System for A Material Pull Strategy. In: Journal of Civil Engineering and Management, v. 20, n. 6 (Dezember 2014).
https://doi.org/10.3846/13923730.2013.802743
-
Kim, Yong-Woo / Azari-N, Rahman / Yi, June-Seong / Bae, Jinwoo (2013): Environmental Impacts Comparison Between On-site Vs. Prefabricated Just-in-time (prefab-jit) Rebar Supply in Construction Projects. In: Journal of Civil Engineering and Management, v. 19, n. 5 (Oktober 2013).
https://doi.org/10.3846/13923730.2013.795186
-
Kim, Sang-chul / Kim, Yong-Woo (2012): Workforce Information Database System to Support Production Planning in Construction Projects. In: Journal of Civil Engineering and Management, v. 18, n. 6 (November 2012).
https://doi.org/10.3846/13923730.2012.725675
-
Chung, Sang-Yeop / Kim, Se-Yun / Kim, Yong-Woo / Han, Tong-Seok (2015): Evaluation of permeability of concrete specimens affected by chloride attack using reconstruction and probabilistic description methods. Vorgetragen bei: IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015.
https://doi.org/10.2749/222137815815774971
-
Kim, Yong-Woo / Min, Oak-Key (1993): Theoretical review on the spurious modes in plane-stress/strain isoparametric meshes. In: Computers & Structures, v. 49, n. 6 (Dezember 1993).
https://doi.org/10.1016/0045-7949(93)90018-9
-
Choi, Kunhee / Lee, Eul‐Bum / Ibbs, C. William / Kim, Yong-Woo (2009): Multifaceted public outreach and cost–benefit analysis for its effectiveness validation. In: Construction Management and Economics, v. 27, n. 8 (August 2009).
https://doi.org/10.1080/01446190903096591
-
Kim, Yong-Woo / Han, Seung-Heon / Yi, June-Seong / Chang, SooWon (2016): Supply chain cost model for prefabricated building material based on time-driven activity-based costing. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 4 (April 2016).
https://doi.org/10.1139/cjce-2015-0010
-
Kim, Yong-Woo / Ballard, Glenn (2005): Profit-point analysis: A tool for general contractors to measure and compare costs of management time expended on different subcontractors. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 4 (August 2005).
https://doi.org/10.1139/l05-021
-
Lee, Hyun Woo / Anderson, Scott M. / Kim, Yong-Woo / Ballard, Glenn (2014): Advancing Impact of Education, Training, and Professional Experience on Integrated Project Delivery. In: Practice Periodical on Structural Design and Construction, v. 19, n. 1 (Februar 2014).
https://doi.org/10.1061/(asce)sc.1943-5576.0000190
-
Kim, Yong-Woo / Bae, Jinwoo (2010): Assessing the Environmental Impacts of a Lean Supply System: Case Study of High-Rise Condominium Construction in Korea. In: Journal of Architectural Engineering (ASCE), v. 16, n. 4 (Dezember 2010).
https://doi.org/10.1061/(asce)ae.1943-5568.0000024