Seungho Kim
- Automatic detection and classification process for concrete defects in deteriorating buildings based on image data. In: Journal of Asian Architecture and Building Engineering. :
- DSM을 활용한 타워크레인 양중계획 최적화에 관한 연구 (Optimization of T/C Lifting Plan using Dependency Structure Matrix (DSM)). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 16, n. 2 (April 2016). (2016):
- Semi-automated visualization method for visual inspection of buildings on BIM using 3D point cloud. In: Journal of Building Engineering, v. 81 (Januar 2024). (2024):
- Application of extended end composite pile design in pile foundation work. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 170, n. 5 (Oktober 2017). (2017):
- Pile Foundation Design Through the Increased Bearing Capacity of Extended End Pile. In: Journal of Asian Architecture and Building Engineering, v. 16, n. 2 (Mai 2017). (2017):
- Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams. In: Journal of Construction Engineering and Management, v. 143, n. 5 (Mai 2017). (2017):
- Sequential dependency structure matrix based framework for leveling of a tower crane lifting plan. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 45, n. 6 (Juni 2018). (2018):